Per m³ of finished concrete, no waste added (add 5–10% for your job).
Mix
Ballast
25kg bags
850kg bulk bags
Cement (25kg)
1:4 (driveways)
1.64 t
66
2 (just enough)
17
1:5 (slabs, bases)
1.71 t
69
2 + one 25kg bag
14
1:6 (footings)
1.76 t
71
2 + three 25kg bags
12
Half a cubic metre needs half as much: about one bulk bag (or 33–36 small bags) and 6–9 bags of cement.
Two 850kg bulk bags fall a few kilos short of a full m³ at 1:5, so the concrete calculator rounds up to a third bag. In practice a 25kg bag tops it up, or you allow a little waste.