1. Home
  2. Guides
  3. Patio & Driveway Sub-Base Depth Guide
UK trade guide

Patio & Driveway Sub-Base Depth Guide

How deep to dig, how much MOT Type 1 to lay and how to compact it for paths, patios, shed bases and driveways, so your paving stays flat for decades.

Last checked 17 October 2026 by the UkToolCalc team

The part of a patio or driveway you never see is what decides whether it stays flat. Most sunken slabs, rocking flags and rutted block paving come down to one thing: a sub-base that was too thin, or not compacted properly. This guide gives typical UK depths for each job, explains how deep to dig in total, and shows how much MOT Type 1 to order.

Already know your sizes? Work out tonnes and bulk bags of MOT Type 1, or plan the whole patio with the patio calculator.

Planning the whole job? Our New patio planner takes your measurements once and builds a single shopping list across every calculator you need.

1. What a sub-base does

A sub-base is a layer of compacted crushed stone between the ground and your paving. It does three jobs:

  • Spreads the load from feet, furniture or cars over a wider area of soil, so the surface doesn't sink in one spot.
  • Drains water away from the underside of the paving, so it isn't sitting on wet, soft ground.
  • Gives a firm, level platform to lay onto, with the fall already built in.

In the UK the standard material is MOT Type 1: crushed stone or concrete graded from about 40mm down to dust, made to the Highways specification. The fines fill the gaps between the larger stones, so it compacts into a dense layer. You'll also see it sold as "Type 1", "DTp1" or "sub-base"; recycled Type 1 made from crushed concrete is usually cheaper and fine for domestic jobs.

2. Sub-base depths by job

These are typical compacted depths on firm ground. Add 50mm or more on soft clay, made-up ground or anywhere that stays wet.

JobMOT Type 1 (compacted)Laying courseSurfaceTotal dig depth
Garden path (foot traffic)75–100mm30–40mm mortar bedSlabs 20–40mm~140–180mm
Patio100mm (150mm on clay)30–40mm mortar bedSlabs 20–40mm~160–180mm
Shed or garden room base (concrete)75–100mm–100mm concrete~175–200mm
Gravel driveway100–150mmStabiliser grid (optional)40–50mm gravel~150–200mm
Block paving driveway150mm (200mm+ on soft ground)30–50mm sharp sand60mm blocks~250–300mm
Concrete driveway150mm–150mm concrete~300mm
Layer build-ups compared: a patio about 165mm deep, a block paved driveway about 250mm deep and a concrete driveway about 300mm deep Patio 25mm slab 40mm bed 100mm MOT ~165mm dig Block drive 60mm blocks 40mm sand 150mm MOT ~250mm dig Concrete drive 150mmconcrete 150mm MOT ~300mm dig
Typical build-ups on firm ground, drawn to the same scale. The dashed line is the finished surface; everything below it has to be dug out first.

3. Working out how deep to dig

Start from the finished surface level and work down. Add together the thickness of the paving, the laying course and the compacted sub-base. That total is how far below the finished level you need to dig.

Dig depth = surface thickness + laying course + compacted sub-base Patio example: 25mm slab + 40mm bed + 100mm MOT = 165mm

Before you dig, set the finished level with pegs and a string line:

  • Next to a house, the finished surface should be at least 150mm below the damp-proof course (DPC), so rain can't splash above it into the wall.
  • Build in a fall of about 1:60 to 1:80 (roughly 15mm per metre) away from the house, so water runs off. Driveways should fall towards a drain, a gully or a planted area.
  • Dig out all the topsoil and any roots, even if that takes you deeper than the table. Top up the extra depth with more sub-base, not soil.

Need to know how much soil you'll be getting rid of? The excavation and muck-away calculator works out the volume (allowing for the soil bulking up as it's dug) and the skips or grab lorry loads you'll need.

4. Soft ground, clay and drainage

Push your heel into the bottom of the dig. If it leaves a deep print, or the ground is sticky clay, the sub-base needs help:

  • Add 50mm or more to the sub-base depth on clay, made-up ground or soft spots.
  • Lay a woven geotextile membrane on the dug-out ground before the MOT Type 1 goes in. It keeps the stone from being pushed into the soil over the years.
  • Dig out any very soft pockets and fill them with compacted sub-base, rather than bridging over them.
  • Don't let water collect against the house or under the paving. On a large area, or where the ground slopes towards the building, add a channel drain or soakaway.

Front gardens in England: paving more than 5m² of a front garden with a non-permeable surface (such as slabs on a mortar bed or standard block paving) needs planning permission, unless rainwater runs off into a lawn, border or soakaway on your own land. Permeable block paving on a Type 3 sub-base, or gravel, avoids this. Check with your council if you're not sure.

5. Laying and compacting MOT Type 1

Depth only counts if it's compacted. Loose MOT Type 1 shrinks by roughly 20–25% under a plate compactor, so a sub-base that was raked out but never compacted will settle later, under your paving.

  1. Spread in layers of no more than 50–75mm (loose depth about 75–100mm). A 150mm driveway sub-base goes down in two or three layers.
  2. Dampen it lightly if it's dusty and dry. Damp (not wet) stone compacts much better.
  3. Compact each layer with 4–6 passes of a plate compactor in different directions, until the plate stops leaving marks. Use a hand tamper in corners.
  4. Check levels and fall against your string lines after each layer, and top up low spots before the next one.
  5. The finished sub-base should be firm enough to walk on without leaving footprints.

6. How much MOT Type 1 to order

Compacted MOT Type 1 weighs about 2.1 tonnes per m³. Most UK merchants sell it in bulk bags of about 850kg (check your supplier's figure; few "tonne bags" hold a full tonne).

Compacted depthTonnes per m²One 850kg bulk bag coversBulk bags for 20m²
75mm0.16 t~5.4 m²4
100mm0.21 t~4.0 m²5
150mm0.32 t~2.7 m²8
200mm0.42 t~2.0 m²10

Add 5–10% for uneven ground and topping up. For larger jobs (roughly 6 tonnes and up), a loose tipper load from a local quarry or aggregates supplier is often cheaper than bulk bags, if you have somewhere to tip it. The MOT Type 1 calculator does the sums for your exact area and depth.

7. Common sub-base mistakes

  • Leaving topsoil in place and laying sub-base on top. Topsoil is organic and keeps settling.
  • Compacting it all in one thick layer. A plate compactor only compacts the top 75mm or so properly.
  • Using soil, sand or rubble to make up depth. Use sub-base all the way up.
  • No fall, so water ponds on the surface and soaks under the edges.
  • Skimping on driveway depth. A patio build-up under a car will rut and crack quickly.
  • Forgetting the edges. Block paving and gravel need a fixed edge restraint (kerbs or edging set in concrete) or the sub-base and surface spread outwards.

Ready to plan the rest? Use the patio calculator for slabs, bedding and jointing, the block paving calculator for driveways, or the concrete calculator for a shed base.

Frequently asked questions

Do I really need a sub-base under a patio?

Yes, unless you are laying on an existing concrete slab in good condition. Topsoil is soft and moves as it gets wet, dries out and freezes. A compacted MOT Type 1 sub-base spreads the load and drains water, which is what stops slabs sinking, rocking and cracking.

Can I lay patio slabs straight onto sand or soil?

Not if you want them to last. Slabs laid on soil or a thin bed of sand settle unevenly within a season or two, especially where people walk most. Dig out the topsoil, lay at least 75–100mm of compacted MOT Type 1, then bed the slabs on a full mortar bed.

How deep should I dig for a driveway?

For a block paved driveway, allow about 250–300mm below the finished surface: 150mm of MOT Type 1 (200mm or more on soft ground), 30–50mm of sharp sand and 60mm blocks. For a concrete driveway, allow about 300mm: 150mm of sub-base plus 150mm of concrete. Dig deeper on soft clay.

What's the difference between MOT Type 1 and Type 3?

Type 1 contains fines (dust) so it compacts into a dense, nearly solid layer. Type 3 has the fines removed, so water can drain straight through it. Type 3 is used under permeable block paving designed to soak up rainwater; Type 1 is the standard choice for everything else.

Do I need a membrane under MOT Type 1?

On firm, well-drained ground it's optional. On clay, soft or wet ground, lay a woven geotextile membrane under the sub-base. It stops the stone being pushed down into the soil over time, which keeps your full sub-base depth working.

Seasonal building tips, once a month

What to get done before the frosts, the storms and the spring rush, plus new calculators and guides. Free, no spam, unsubscribe in one click.

Get the tips

Related calculators

Tools & materials for this job

Affiliate links: as an Amazon Associate we earn from qualifying purchases, at no extra cost to you.