1. Home
  2. Garden & Landscaping
  3. Turf Calculator
Garden & Landscaping

Turf Calculator

Find out how many rolls of turf you need for a new lawn, for rectangular, circular or irregular shapes, plus topsoil and pre-turf fertiliser.

Last checked 19 October 2026 by the UkToolCalc team

Lawn shape
m
m
m
m²
m²
mm
Depth of new topsoil under the turf.
£

How the turf calculator works

Turf is sold by the roll, and most UK rolls cover exactly 1m². The calculator works out your lawn area (length × width, or π × radius² for a circle), adds an allowance for cutting to shape, and divides by the roll size:

Rolls = area × (1 + allowance) ÷ roll size, rounded up Topsoil (m³) = area × depth ÷ 1000 Pre-turf fertiliser ≈ 35g per m²

For an irregular lawn, split it into rectangles and circles, work out each area and add them up, then use "Area" mode.

How to lay turf

  1. Remove weeds and old grass, dig or rotavate to about 150mm and remove stones.
  2. Rake level, then firm by "heeling" (shuffling across on your heels) or with a roller. Rake again to a fine tilth.
  3. Spread pre-turf fertiliser and lightly rake in.
  4. Lay the first row along a straight edge, then stagger the joints like brickwork. Work from planks so you don't stand on the prepared soil.
  5. Butt the edges tightly, trim with a half-moon edger, and water thoroughly.

Worked example: an 8m × 5m back lawn

8m × 5m = 40m². With straight edges, add 5% for trimming: 42m², so order 42 rolls of standard 1m² turf. At £3.75 a roll that's about £158 before delivery. You'll also want about 1.4kg of pre-turf fertiliser and roughly 600 litres of water for the first soak, which takes a while from a hose, so start early. A circular lawn 6m across is 28.3m², and with 10% for the curved edge that's 32 rolls.

If the existing soil is poor, add a layer of new topsoil first. Enter its depth above, or open the topsoil calculator for bulk bags and tonnes.

When to lay turf

Turf can be laid for much of the year, but autumn and spring are easiest: the soil is warm and moist, so roots grow quickly and you need less watering. Avoid frozen or waterlogged ground, and be ready to water every day if you lay it in summer heat. Order for a day when you can lay it all. Turf stacked on a pallet starts to yellow within a day or two in warm weather.

Aftercare for the first month

  • Water: lift a corner after watering to check the soil underneath is wet, not just the grass. Gaps opening between rolls means it needs more water.
  • Stay off it: keep foot traffic off for about three weeks, until gently tugging a corner shows it has rooted.
  • First cut: when the grass is around 5–7cm tall, mow with the blades on their highest setting, taking off no more than a third. Lower the height gradually over later cuts.

Common turfing mistakes

  • Skipping the preparation. Turf laid on compacted, stony or uneven ground stays bumpy and patchy. Most of the work is in the soil, not the laying.
  • Lining up the joints. Stagger rolls like brickwork so the seams knit together and don't show as lines.
  • Tiny strips at the edges. Small offcuts dry out and die. Put full rolls on the edges and fill in with cut pieces nearer the middle.
  • Under-watering at the start. This is the most common reason new turf shrinks, browns and fails to root.

Weighing up real grass against a fake lawn? The artificial grass calculator gives the rolls and sub-base for the same area. See all our garden and landscaping calculators.

Related calculators

Frequently asked questions

How much turf do I need?

Measure the lawn area in m² and add 5% for straight edges or 10% for curves and irregular shapes. Most UK turf rolls are 1m² (about 1.63m × 0.61m), so the number of rolls equals the area including the allowance.

How big is a roll of turf in the UK?

A standard UK roll of turf is about 1.63m long and 0.61m wide, which covers 1m². Some suppliers sell big rolls for large areas, so check before ordering.

How soon should I lay turf after delivery?

Ideally the same day, and within 24 hours in summer. Turf rolls heat up and yellow quickly when left stacked. Keep them in the shade and lightly watered if there's a delay.

How much topsoil do I need under turf?

Aim for at least 100–150mm of good topsoil under new turf. If you're adding a layer on top of poor ground, that's 0.1–0.15m³ per m² of lawn.

How often should I water new turf?

Water thoroughly straight after laying (until the soil under the turf is wet), then daily in warm weather for 2–3 weeks. Avoid walking on it for about 3 weeks while the roots establish.

Tools & materials for this job

Affiliate links: as an Amazon Associate we earn from qualifying purchases, at no extra cost to you.

Run a website or blog? Add this calculator to your site for free.