1. Home
  2. Floors, Walls & Decorating
  3. Floor Screed Calculator
Floors, Walls & Decorating

Floor Screed Calculator (Sand & Cement)

Calculate the cement bags and sharp sand for a traditional sand and cement floor screed, from thin bonded screeds to 75mm underfloor heating screeds, plus an estimate of drying time.

Last checked 19 October 2026 by the UkToolCalc team

Screed type
Measure floor by
m
m
m²
mm
£
£
Read the guideSelf-Levelling Compound & Plasterboard Guide

How the screed calculator works

A traditional floor screed is a semi-dry mix of sharp sand and cement that is compacted and ruled off by hand. Because it contains very little water, it's best estimated by the weight of dry materials. A compacted semi-dry screed weighs around 2,100kg per m³, which is split between sand and cement according to your mix ratio.

Volume (m³) = area (m²) × depth (mm) ÷ 1000 Dry mix (kg) = volume × 2,100 × (1 + wastage) Cement (kg) = dry mix ÷ (ratio + 1) Sharp sand = dry mix − cement

For example, 20m² at 65mm is 1.3m³. With 10% wastage that's about 3,003kg of dry materials. At 4:1, you'll need 601kg of cement (25 bags) and 2.4 tonnes of sharp sand (3 bulk bags).

Recommended screed depths

Screed typeTypical depthNotes
Bonded25–40mmBonded to a primed concrete slab with a slurry coat
Unbonded50mm min.Laid on a damp-proof membrane
Floating65mm min.Over rigid insulation boards
Underfloor heating65–75mmAt least 25mm cover over the pipes

Drying time

Screeds dry at roughly 1mm per day for the first 40mm, then about 0.5mm per day for any depth above that, in a well-ventilated room at around 20°C. The calculator shows this as an estimate. Before laying wood, LVT or vinyl, test the moisture with a hygrometer: most manufacturers require 75% relative humidity or lower. Underfloor heating can be commissioned gradually after about 21 days to help it dry.

Tips for a strong screed

  • Mix to a "damp sand" consistency: a squeezed ball should hold its shape without water running out.
  • Use screeding rails or depth battens and rule off with a long straight edge.
  • Compact thoroughly, especially at edges and around pipes. Poor compaction is the main cause of hollow, crumbly screeds.
  • Add polypropylene fibres to reduce shrinkage cracking, and fit perimeter edge strip on floating and heated screeds.
  • Cure slowly: cover with polythene for the first 7 days and keep away from direct heat.

Worked example: a 5m × 4m extension floor over insulation

A floating screed over insulation boards should be at least 65mm thick. 20m² × 65mm = 1.3m³, about 3 tonnes of dry mix with wastage: 25 bags of cement and 3 bulk bags of sharp sand at 4:1. That's a lot of mixing for one day. A forced-action (pan) mixer and two or three people make it manageable. Allow roughly 90 days before laying wood or vinyl, unless underfloor heating is used to help it dry. Choose the "75mm UFH" preset if pipes run in the screed.

Traditional screed, liquid screed or levelling compound?

  • Sand and cement (semi-dry): cheap materials, easy to buy in bags, and fine for most rooms. It needs skill to get flat and is slow to dry.
  • Liquid (flowing) screed: pumped in by a specialist, self-levels, and suits underfloor heating well because it flows round the pipes. Some types (anhydrite) need their surface sanded and must be dry before tiles or adhesive go on. Ask the installer for the drying advice for their product.
  • Self-levelling compound: for thin layers over a sound base, usually under 10–20mm. Use the self-levelling compound calculator.

Common screeding mistakes

  • Too wet a mix. Extra water makes it easier to lay but shrinks and cracks as it dries. Keep it at damp-sand consistency.
  • No edge strip on floating screeds. Without room to move at the walls, the screed cracks as it shrinks.
  • Laying floors too soon. Moisture trapped under wood, LVT or vinyl causes swelling, smells and failed adhesive. Test before laying, don't guess.
  • Thin patches over pipes or conduits. Keep the minimum depth everywhere, not just on average.

Once the screed is dry, plan the finish with the flooring or tile calculator. For thicker structural slabs, use the concrete calculator.

Related calculators

Frequently asked questions

How much sand and cement do I need for 1m³ of screed?

A 1m³ semi-dry 4:1 screed uses roughly 420kg of cement (about 17 × 25kg bags) and about 1.7 tonnes of sharp sand. A 3:1 mix uses about 525kg of cement (21 bags) and 1.6 tonnes of sand.

What sand should I use for floor screed?

Use sharp sand (also called concreting or grit sand), ideally a 0–4mm screeding sand. Soft building sand is too fine and makes a weak, dusty screed that is prone to cracking.

How thick should a floor screed be?

As a guide: bonded screeds 25–40mm, unbonded screeds on a DPM at least 50mm, and floating screeds over insulation at least 65mm (75mm for domestic underfloor heating, giving about 25–30mm of cover over the pipes).

How long does sand and cement screed take to dry?

The rule of thumb is 1mm per day for the first 40mm, then about 0.5mm per day after that, in good drying conditions. A 50mm screed takes around 60 days and a 75mm screed around 110 days before moisture-sensitive floor coverings go down.

What mix ratio is best for floor screed?

A 4:1 sharp sand to cement mix is standard for domestic floors. Use 3:1 for thin bonded screeds or heavy-duty areas, and 5:1 only for light-duty or levelling layers.

Tools & materials for this job

Affiliate links: as an Amazon Associate we earn from qualifying purchases, at no extra cost to you.

Run a website or blog? Add this calculator to your site for free.