Concrete, Sub-Base & Paving

Patio & Paving Slab Calculator

Plan a new patio: get the number of paving slabs, plus the MOT Type 1 sub-base, sharp sand, cement and jointing compound, with a full materials list.

Last checked 19 October 2026 by the UkToolCalc team

Measure by
m
m
m²
mm
mm
Cross-section of a patio: paving slab on a mortar bed, on compacted MOT Type 1 sub-base, on a geotextile membrane over firm subsoil Fall ~1:60 from house ~165mm dig ~25mm paving slab 40mm bed, 6:1 mortar 100mm MOT Type 1 Geotextile (soft ground) Firm subsoil
Cross-section, not to scale. The depths follow your inputs; slab thickness is typical for the slab type you pick.
£
Read the guidePatio & Driveway Sub-Base Depth GuidePlan the whole projectNew patio planner

How the patio calculator works

The calculator works out the area, then each layer of a properly built patio: the sub-base, the mortar bed, the slabs and the joints.

Slabs = area × (1 + allowance) ÷ ((L + joint) × (W + joint)) MOT Type 1 (t) = area × sub-base depth × 2.1 × 1.05 Bedding mix (kg) = area × bed depth × 2,100 × 1.1, split by ratio Jointing (kg/m²) = (L + W) ÷ (L × W) × 25mm depth × joint × 1.6

Patio build-up (from the bottom)

  1. Excavation: to about 160–180mm below the finished level, with a fall away from the house.
  2. Membrane: woven geotextile on soft ground.
  3. Sub-base: 100mm of MOT Type 1 compacted in two layers (150mm for heavy use or clay).
  4. Bed: a full 30–40mm bed of 4:1 to 6:1 sharp sand and cement, damp but not wet.
  5. Slabs: primed (porcelain always; natural stone recommended), then tapped down to level.
  6. Joints: brush-in jointing compound or a 3:1 sand and cement pointing mortar after 24 hours.

Slabs per m²

Slab sizeSlabs per m² (10mm joint)
450 × 450mm4.73
600 × 300mm5.29
600 × 600mm2.69
900 × 600mm1.80
800 × 800mm1.52

Worked example: a 4m × 3m patio in 600 × 600mm slabs

12m² plus 10% for cuts is 13.2m². With 10mm joints, each slab takes up 0.61m × 0.61m = 0.372m², so you need 36 slabs. Underneath, 100mm of MOT Type 1 is about 2.6 tonnes (4 bulk bags). A 40mm bed in a 6:1 mix needs about 950kg of sharp sand (2 bulk bags, with plenty to spare) and 7 bags of cement. Jointing 10mm gaps takes roughly 18kg of compound, or 2 tubs. The dig is about 165mm below the finished level, nearly 2m³ of soil once it's loose.

To plan the whole job, including the dig-out and skip, use the new patio planner, which opens each step with these measurements.

Setting out before you dig

  • Dry-lay a row of slabs on the lawn first and adjust the patio size to whole slabs where you can. It saves cutting and looks better.
  • Mixed-size (project) packs of sandstone come with a laying plan. Follow it, or the last few metres won't fit together.
  • Set string lines for the finished level and fall: about 1:60–1:80 away from the house, with the top of the patio at least 150mm below the damp-proof course.

Porcelain or natural stone?

Porcelain is uniform, stain-resistant and low-maintenance, but it's harder to cut (you need a wet saw or diamond blade), needs a priming slurry on every slab, and suits narrower 3–5mm joints. Sandstone and other natural stone varies in thickness, so it's laid on a full bed and tapped down slab by slab. It weathers and needs occasional cleaning, but is more forgiving to lay. Concrete utility slabs are the cheapest option for paths and shed bases.

Common patio mistakes

  • Spot (dot-and-dab) bedding. Five blobs of mortar under each slab leave hollows that crack and rock, and let water collect under the slab. Use a full, solid bed.
  • A thin or uncompacted sub-base. This is the most common cause of sunken patios. See the sub-base depth guide for your ground.
  • No fall, or a fall towards the house. Puddles stain the paving and can push water against the walls.
  • Jointing in the wrong weather. Most jointing compounds need dry or damp conditions within a set temperature range. Read the tub before you open it.

For the sub-base alone, use the MOT Type 1 calculator. For a driveway, block paving is usually better: see the block paving calculator.

Related calculators

Frequently asked questions

How many paving slabs do I need?

Divide the patio area by the area of one slab plus its joint, and add 5–10% for cuts. A 4m × 3m patio (12m²) with 600 × 600mm slabs and 10mm joints needs about 33 slabs plus 3 spare: roughly 36.

What should I lay patio slabs on?

For a lasting patio, lay a full mortar bed (about 40mm of 6:1 sharp sand and cement) on 100mm of compacted MOT Type 1. Avoid 'five dabs', which leaves voids where water can collect and slabs can crack or rock.

How much sharp sand and cement for a patio?

A 40mm bed uses about 0.084 tonnes of dry mix per m². At 6:1 that's around 72kg of sharp sand and 12kg of cement per m², or roughly 1 bag of cement for every 2m² of patio.

Do porcelain slabs need a primer?

Yes. Porcelain is almost non-porous, so it must be painted on the back with a priming slurry just before laying, or it won't bond to the mortar bed and will work loose.

What fall should a patio have?

A fall of about 1:60 to 1:80 (roughly 15mm per metre) away from the house, so rainwater drains off. The finished patio should be at least 150mm below the damp-proof course.