Self-Levelling Compound Calculator

Work out exactly how many 20kg or 25kg bags of floor levelling compound you need, plus primer, mixing water and perimeter edge strip, so you never run short halfway through a pour.

Last checked 19 October 2026 by the UkToolCalc team

Quick depth
Measure floor by
m
m
m²
mm
Measure low spots with a straight edge and take an average.
£
Read the guideSelf-Levelling Compound & Plasterboard Guide

How this self-levelling calculator works

Floor levelling compounds are sold by weight, but the amount you use depends on area × depth. Almost every UK brand (Mapei Ultraplan, Bostik Screedmaster, Dunlop, Setcrete, Instarmac) uses between 1.5 and 1.7kg of powder per m² per mm of thickness. The calculator uses this formula:

Powder (kg) = area (m²) × depth (mm) × kg/m²/mm × (1 + wastage) Bags = powder ÷ bag weight, rounded up

For example, a 4.5m × 3.6m kitchen (16.2m²) at 5mm with a fibre-reinforced compound needs 16.2 × 5 × 1.7 = 137.7kg, plus 5% wastage = 144.6kg, or 8 × 20kg bags.

Coverage per bag at common depths

Depth20kg bag covers25kg bag coversBags for 15m² (20kg)
3mm3.9 m²4.9 m²4
5mm2.35 m²2.9 m²7
10mm1.18 m²1.47 m²13
20mm0.59 m²0.74 m²26

These figures are based on 1.7kg/m²/mm with no wastage. Always add 5%–10% for low spots you didn't measure. Running out mid-pour leaves a visible joint that you'll need to sand or skim over.

Priming the subfloor

  • Concrete and sand/cement screed: vacuum thoroughly, then apply SBR or acrylic primer diluted about 3:1 with water, followed by a second coat diluted 1:1. This stops the floor sucking water out of the compound before it levels.
  • Plywood or timber: screw boards down every 150mm, prime with neat primer and use a fibre-reinforced compound at a minimum of 5mm.
  • Ceramic tiles: degrease thoroughly and use a gritted bonding primer so the compound has a mechanical key.
  • Bitumen or old adhesive: scrape off loose ridges and use a primer approved for bitumen before pouring.

Fix a foam perimeter strip around the walls before pouring. It lets the floor move and stops the compound bonding to skirting or plaster. Seal any gaps and doorways with tape or a timber batten so the liquid compound can't escape.

Mixing and pouring tips

  • Have all bags in the room and two buckets ready. Work fast: most compounds have 15–30 minutes of working time.
  • Add powder to water (not water to powder), mix with a paddle mixer for 2–3 minutes and pour immediately.
  • Work in strips away from the door and use a spiked roller to release air and blend each mix into the last.
  • Keep the room free of draughts and direct heat (including underfloor heating) while it cures.

Measuring the average depth

The depth you enter makes the biggest difference to the number of bags. Lay a long straight edge (2m if you have one) across the floor in a grid, every metre or so in both directions, and measure the gap under it at each point. Add up the gaps and divide by the number of readings for the average, then add the minimum depth the compound needs over the high spots (often 2–3mm). A floor that "looks flat" can easily average 5–8mm once measured this way.

When not to use levelling compound

  • Bouncy floors: compound cracks on floors that flex. Fix loose boards and overboard with plywood first.
  • Damp floors: rising damp or a missing damp-proof membrane needs sorting first. Compound won't stop moisture.
  • Very deep fills: for more than about 20–30mm over large areas, a sand and cement screed is usually cheaper. Compare with the screed calculator.

Common mistakes

  • Running out mid-pour. Have every bag in the room before you start. The 5% wastage allowance is there for a reason.
  • Too much water. It flows nicely but leaves a weak, dusty surface. Measure the water every time.
  • Skipping the primer. Unprimed concrete sucks the water out and causes pinholes and poor bonding.

Our self-levelling compound guide goes into priming and coverage in more detail. Once it's down, plan the finish with the flooring or tile calculator.

Related calculators

Frequently asked questions

How many m² does a 20kg bag of self-levelling compound cover?

At 1.7kg per m² per mm, a 20kg bag covers about 3.9m² at 3mm, 2.35m² at 5mm and 1.2m² at 10mm. A 25kg bag covers 25% more: about 2.9m² at 5mm.

How much water goes in a 20kg bag of floor leveller?

Most 20kg water-mix compounds take roughly 4 to 4.5 litres of clean water and most 25kg bags take 5 to 5.5 litres. Always measure the exact amount printed on the bag: too much water weakens the surface and causes dusting and cracking.

Can I use PVA to prime a floor before self-levelling compound?

No. PVA re-emulsifies when the wet compound sits on it, which can stop the leveller bonding and leave hollow, cracked patches. Use an acrylic or SBR floor primer, normally two coats on porous concrete.

What is the maximum depth for self-levelling compound?

Standard compounds are typically rated 2mm–10mm, fibre-reinforced and 'deep base' products go up to 30mm–50mm or more in one pour. For deeper fills use a sand and cement screed or a deep-fill compound designed for it.

How long before I can walk on or tile self-levelling compound?

Most rapid-setting compounds take light foot traffic after 2–4 hours and can be tiled after about 24 hours. Moisture-sensitive floors such as LVT and wood usually need longer; check the bag's drying time for your depth.