- 2.1 tper m³ compacted
- ~4m²per 850kg bag at 100mm
- 100mmstandard patio sub-base
- 75mmmax per compacted layer
MOT Type 1 by patio size
Compacted depth, 5% extra included, 850kg bulk bags.
| Patio area | 100mm deep | 150mm deep | Membrane |
|---|---|---|---|
| 10 m² | 2.2 t · 3 bags | 3.3 t · 4 bags | 11.5 m² |
| 15 m² | 3.3 t · 4 bags | 5.0 t · 6 bags | 17.2 m² |
| 20 m² | 4.4 t · 6 bags | 6.6 t · 8 bags | 23 m² |
| 30 m² | 6.6 t · 8 bags | 9.9 t · 12 bags | 34.5 m² |
The sum
On top of the MOT goes a mortar bed for the slabs: the patio calculator does the slabs, sand and cement. The patio sub-base guide explains depths for each type of ground.